How to issue a building permit in Saudi Arabia | Your step-by-step guide
Saudi real estate services are considered among the most important digital services that have contributed to facilitating construction procedures and real estate development within the Kingdom, as citizens and investors can now complete many transactions digitally without the need for complex paper-based procedures. One of the most important of these services is the building permit issuance service, which represents the essential step before starting any construction project.
In this comprehensive guide, we will explain how to issue a building permit step by step via the Balady platform, including how to track the application and reach the stage of building permit printing easily through official platforms. This helps simplify the procedures and complete them without complications.
Why do you need a building permit?
Obtaining a permit represents both a legal and technical protection factor, as it ensures that the project proceeds within an approved framework that prevents future problems. Ignoring it may expose the owner to violations or delays in services. The most important reasons that make issuing a building permit necessary are:
- Avoiding fines and regulatory violations
- Ensuring the project complies with the Saudi Building Code
- Facilitating the connection of electricity, water, and sewage services
- Protecting the property during sale or ownership transfer
- Reducing the risk of future modifications
Building permit issuance requirements
Before starting the electronic procedures, it is necessary to ensure that the basic requirements are met to guarantee application approval without delay, as the relevant authorities rely directly on the accuracy of this data. The requirements for issuing a building permit include:
- Ownership of the land with an official deed or certified authorization
- Engineering drawings approved by a licensed engineering office
- Full compliance with the Saudi Building Code
- The land must be free of disputes or existing violations
Steps to issue a building permit via the Balady platform
Submission is now fully electronic, making the process faster and clearer without the need to visit government offices directly. The steps for issuing a building permit are as follows:
- Log in to the “Balady” platform via the National Access system
- Select construction permit services
- Choose the required permit type (new construction, modification, or fencing)
- Enter land details accurately (deed number, plan, and location)
- Upload engineering drawings in PDF format
- Review technical requirements and ensure compliance with the Building Code
- Pay the fees electronically via the “SADAD” system
- Receive the permit electronically with the option to print the building permit immediately
How much are building permit issuance fees?
Fees vary depending on the nature, size, and location of the project, and are calculated automatically during the application process without a fixed amount for all cases. The cost of issuing a building permit depends on:
- Total construction area
- Type of use (residential or commercial)
- Location of the land within the city
- Project-related services
The electronic service is characterized by fast processing compared to traditional methods, provided that all data and attachments are complete. A building permit is usually issued within 3 to 7 working days.
Entities involved in permit approval
The licensing process goes through several reviews to ensure compliance with safety and urban planning regulations, and includes:
- Ministry of Municipal and Rural Affairs and Housing
- Civil Defense
- Utility service providers (electricity and water when required)
Saudi Building Code and its role in licensing
The Saudi Building Code is considered the main reference that all licensing processes rely on, as it defines the technical and engineering standards that must be followed in every project. It includes:
- Distances between buildings
- Permitted building heights
- Thermal and acoustic insulation systems
- Safety, electricity, and sewage requirements
Read also about:
Fal Real Estate License: Its Types and How to Obtain It
Everything You Need to Know About Construction Costs in Saudi Arabia Before Starting Your Project
When is a building permit canceled?
There are specific cases that may lead to canceling the permit if regulations are not followed after issuance. The most notable cases include:
- Failure to start construction within one year
- Violation of approved architectural plans
- Change of ownership without updating data
Issuance of a building completion certificate
After completing the project, an important step comes that is no less important than the permit itself, which is officially documenting the completion of the work.
The building completion certificate issuance is used to prove that the building has been constructed according to the approved plans, and it is essential for permanent utility connections and completing real estate procedures
Important tips before applying
Following certain guidelines helps speed up approval and avoid rejection or delays, including:
- Ensuring the accuracy of land data
- Choosing an accredited engineering office
- Regularly tracking the application
- Full compliance with the Building Code
- Reviewing municipal requirements for the area
Frequently asked questions about building permit issuance
Can someone else apply on my behalf?
Yes, through a certified electronic authorization.
Do external additions require a permit?
Yes, a permit must be issued according to the regulations.
Can the permit be modified after issuance?
Yes, through the permit modification service on the Balady platform.